We’re excited to announce that part number DD101 LONG LEAD is now available in our ready-to-ship inventory. Part number DD101 LONG LEAD is a Capacitor Fixed Cer manufactured by Crl Components Inc with FSC 5910 Capacitors. Are you interested in a quick and competitive quote for this part? If so, just fill out the short Request for Quote (RFQ) form below to get started.
As you fill out the RFQ form, make sure that you carefully complete all fields, especially the asterisk-marked (*) fields like Need Parts By and Quantity (ea) for the NSN part DD101 LONG LEAD. A majority of your quote will be determined by your response to these fields. One of our dedicated sales representatives will get back to you with your quote in 15 minutes or less after receiving your RFQ for DD101 LONG LEAD.
ASAP NSN Parts, owned and operated by ASAP Semiconductor, is a leading distributor of Crl Components Inc hard-to-find parts for the aerospace, aviation, and defense industries. We’re an AS9120B, ISO 9001:2015, and FAA AC 0056B accredited member of the Aviation Suppliers Association (ASA). With our vast and comprehensive inventory of over 2 billion parts sourced from over 5000 global manufacturers and our many advanced shipping facilities, we can get you the Crl Components Inc NSN parts you need at the fastest delivery times in the industry with same-day and next-day delivery.
Is 15 minutes still too long to wait for a quote? If so, you can call us at our toll-free number, +1-714-705-4780, or email us your Bill of Materials (BOM) at sales@asap-nsnparts.us. We’re available and ready to help, 24/7x365. And for an even faster and more convenient purchasing experience, you can download the ASAP Semiconductor App from Google Play or the App Store.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
064-064 | 3 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABKW | UNABLE TO DECODE | UNABLE TO DECODE |
ABMK | UNABLE TO DECODE | UNABLE TO DECODE |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE,AITOAIR,PHOEBNIX (AIM54); TELETYPE,MODEL 28; TEST CONSOLES,MINISACE; ENGINE,AIRCRAFT TF33PW102 (C135E,EC135H/K/P); MISSILE,AIRTOAIR,SPARROW (AIM7); SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Don’t forget That You Can Always Get an Instant RFQ Within Fifteen Minutes Or Less. All You Need to Do Is Fill Out the form On Our Home Page, and You Can Get Started today.
Request for Quote