Request RFQ Now For CK-104 LONG LEAD with NSN 5910-00-113-5499 of Crl Components Inc

Part Number : CK-104 LONG LEAD
Alternate P/N: CK104LONGLEAD
Item Name : capacitor fixed cer
CAGE Code : 71590
Manufacturer : crl components inc
NIIN : 00-113-5499
Country : USA
NCB Code : 00
INC Code : 00007

We’re excited to announce that part number CK-104 LONG LEAD is now available in our ready-to-ship inventory. Part number CK-104 LONG LEAD is a Capacitor Fixed Cer manufactured by Crl Components Inc with FSC 5910 Capacitors. Are you interested in a quick and competitive quote for this part? If so, just fill out the short Request for Quote (RFQ) form below to get started.

As you fill out the RFQ form, make sure that you carefully complete all fields, especially the asterisk-marked (*) fields like Need Parts By and Quantity (ea) for the NSN part CK-104 LONG LEAD. A majority of your quote will be determined by your response to these fields. One of our dedicated sales representatives will get back to you with your quote in 15 minutes or less after receiving your RFQ for CK-104 LONG LEAD.

* Fields are required

*
*
*
*

Note: We will not share your information to any third parties.

Contact Information

*
*
*
*
*


 * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms & Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.

  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

ASAP NSN Parts, owned and operated by ASAP Semiconductor, is a leading distributor of Crl Components Inc hard-to-find parts for the aerospace, aviation, and defense industries. We’re an AS9120B, ISO 9001:2015, and FAA AC 0056B accredited member of the Aviation Suppliers Association (ASA). With our vast and comprehensive inventory of over 2 billion parts sourced from over 5000 global manufacturers and our many advanced shipping facilities, we can get you the Crl Components Inc NSN parts you need at the fastest delivery times in the industry with same-day and next-day delivery.

Is 15 minutes still too long to wait for a quote? If so, you can call us at our toll-free number, +1-714-705-4780, or email us your Bill of Materials (BOM) at sales@asap-nsnparts.us. We’re available and ready to help, 24/7x365. And for an even faster and more convenient purchasing experience, you can download the ASAP Semiconductor App from Google Play or the App Store.

NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-113-5499

Item PartTypeName:

CAPACITOR,FIXED,CERAMIC DIELECTR

59100011354990PA
CIICHCCESDPMICCriticalityENAC
UAA0
Part NumberISCRNVCRNCCHCCMSDSSADC
MIL-PRF-39014/2E14

Characteristics Data of NSN 5910-00-113-5499, 5910001135499

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE
AARGRELIABILITY INDICATORESTABLISHED
AARHRELIABILITY FAILURE RATE LEVEL IN PERCENT0.0010
ABJTTERMINAL LENGTH1.250 INCHES MINIMUM
ADAQBODY LENGTH0.290 INCHES NOMINAL
ADATBODY WIDTH0.290 INCHES NOMINAL
ADAUBODY HEIGHT0.090 INCHES NOMINAL
AEBPCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH0.200 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
AGAVEND ITEM IDENTIFICATIONMULTIPLE LAUNCH ROCKET SYSTEM (MLRS)
CQBFINSULATION RESISTANCE AT MAXIMUM OPERATING TEMP10000.0 MEGOHMS
CQBQCAPACITANCE VALUE PER SECTION0.100 MICROFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION100.0 DC SINGLE SECTION
CRTPTOLERANCE RANGE PER SECTION-10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP100000.0 MEGOHMS
CWPMDISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT2.5000
CWSGTERMINAL SURFACE TREATMENTSOLDER
NHCFNUCLEAR HARDNESS CRITICAL FEATUREHARDENED
TESTTEST DATA DOCUMENT81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD
ZZZKSPECIFICATION/STANDARD DATA81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION

ASAP Semiconductor's Certifications and Memberships

Line

Thank You for Visiting.

Don’t forget That You Can Always Get an Instant RFQ Within Fifteen Minutes Or Less. All You Need to Do Is Fill Out the form On Our Home Page, and You Can Get Started today.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.